Contractor Business Guide
Calculate Your Contractor Overhead Percentage
Build an overhead rate from the same period in your own records. Name whether it is a share of revenue or a loading on direct job cost before using it in a price.
TL;DR — Contractor Overhead
Start with the denominator: annual overhead ÷ annual revenue gives a share of revenue. Annual overhead ÷ annual direct job cost gives a cost-based loading. Keep the period and expense classifications consistent, then check the result against completed jobs.
Use your own expense records and state the calculation basis before applying a rate.
Records to Collect Before Choosing a Rate
Gather these records for one accounting period. Ask your bookkeeper which costs belong in each category and identify missing figures before choosing a rate.
| Record | Why it matters | Question to resolve |
|---|---|---|
| Revenue | Denominator for a revenue share | Same period as overhead? |
| Direct job cost | Denominator for cost loading | Which job costs are included? |
| Shared overhead | Costs allocated across jobs | Any job expense counted twice? |
| Owner work | Job and administrative time | Actual compensation or planning allowance? |
| Completed jobs | Compare estimated with actual cost | Which assumption needs revision? |
Solo Operators: Count Your Time
Record owner hours spent on job work and on administration separately. Distinguish actual compensation in the books from a planning allowance for unpaid time so the same work is not counted twice.
Cost Questions by Trade
The trade name does not determine a rate. Use these prompts to find costs and allocation questions in your own records.
| Trade | Records to gather | Allocation question |
|---|---|---|
| Roofing | Material, equipment and job-labor records | Which insurance or vehicle costs are already charged to jobs? |
| HVAC | Parts, service/install labor and vehicle records | How are inventory and shared dispatch costs treated? |
| Plumbing | Parts, travel and job-labor records | Which costs belong to a particular visit? |
| Electrical | Job labor, materials and permit records | Which training costs are shared across jobs? |
| Remodeling | Trade invoices, design and selection time | Which coordination costs belong to this project? |
| Painting | Preparation, coatings and labor records | Are tools and travel already in direct cost? |
| Landscaping | Crew, equipment and seasonal records | Does the review period cover seasonal costs? |
| General Contractor | Subcontractor invoices and management time | Which management costs are direct versus shared? |
What’s Included in Overhead?
Classify each expense consistently. A vehicle, tool or insurance cost may be charged to a job or allocated across jobs under your policy; include it once.
- Insurance: Identify the period and whether premiums are job-specific or shared.
- Vehicles: Reconcile actual costs and the allocation method; avoid counting the same cost twice.
- Facilities: Record the period for rent, utilities and storage.
- Administration: Separate office work from direct job labor.
- Marketing: Record paid costs and the period they support.
- Equipment: Ask how purchases, rental and depreciation are treated in your books.
- Owner work: Separate direct job time, administrative compensation and any additional planning allowance.
How to Calculate Your Overhead Rate
Choose one period, reconcile the totals to your books and write the base beside each percentage:
- Annual overhead: Reconcile all included shared costs to the same period.
- Annual revenue and direct job cost: Record both totals for that period.
- Two different rates: overhead ÷ revenue; overhead ÷ direct job cost.
Teaching model: $180,000 annual overhead ÷ $600,000 annual revenue = 30% of revenue. With $360,000 annual direct job cost, the same overhead is 50% of direct cost. These are invented inputs for the same period, not trade averages.
Set Your Next Records Review
Compare budget and actual overhead when a cost or workload changes. Record what changed, who will update the assumptions and when you will review the next completed job.
Using Your Overhead Rate in Pricing
For a model where overhead and desired profit are both shares of the selling price, use Price = direct cost ÷ (1 − overhead share − profit share). The shares must sum to less than 100%. For a cost-based loading, use the separately calculated overhead/direct-cost rate instead.
- Write the direct job costs included in the model.
- State whether overhead is a revenue share or a direct-cost loading.
- State whether profit is a share of price or a markup on a named cost base.
- Reproduce the price, then compare estimated and actual costs after completion.
Teaching price: $10,000 direct cost ÷ (1 − 0.35 − 0.20) = $22,222.22. Rounded overhead is $7,777.78 and profit is $4,444.44. The 35% overhead and 20% profit are both shares of price. Replace these assumptions with your records; a priced profit allowance is not final realized profit.
Compare the Bases Before You Price
Compare the two bases below, then write the formula and included costs beside your own estimate.
Revenue-share model: overhead is 35% of selling price and profit is 20% of selling price. Price = $10,000 ÷ 0.45 = $22,222.22.
Explore a sample customer estimate
Explore the interactive estimate format with illustrative quantities and prices. The sample does not represent a customer job or verified profit result.
Explore Interactive Sample →Frequently Asked Questions
What is a good overhead percentage for contractors?
Start with the costs and accounting period in your own books. A rate based on revenue differs from a rate based on direct job cost. Check the included costs and denominator before comparing rates or using one in a price.
How do I review overhead costs?
Reconcile actual expenses for one period, separate direct job costs from shared costs and identify any missing or duplicated amounts. Choose one cost question to resolve before changing a pricing assumption.
Should owner time be included?
Record owner job time and administrative work separately. Distinguish compensation already in the books from an additional planning allowance so the same work is not counted twice.
How often should I recalculate overhead?
Choose a review date and revisit the calculation when costs or workload change. Compare completed-job estimates with actual costs using the same classifications and period.
What is the difference between overhead and profit?
Overhead is the shared cost included in your model. Profit is the amount left after the costs included in that model. A percentage allowance in an estimate is not a measured final result; reconcile actual revenue and costs after the job.
Prepare Your Figures for Review
Use the Profit Score questions to organize a review of the figures you enter. Reconcile your answers to your own records before making a pricing decision.
Prepare and Review Your Next Estimate
Use BuildFolio to prepare and review estimates for your business. Review the Pro plan and its current limits before starting a card-backed trial.
Start 14-Day Pro TrialThe 14-day Pro trial requires a card and renews at $39/month unless canceled before the trial ends. A Free account is also available; it does not include every Pro feature.
Are you a homeowner? Try our free tools: